Client: Ministry of Public Works and communications.
Period: 2009 – 2011.
Main jobs executed:

  • Length of the section: 37 km.
  • Embankment.
  • Soil Base Added.
  • Aggregate soil Sub Base.
  • Asphalted Concrete.
  • Soil cement.
  • Reinforced concrete Bridges – Length: 60.00 ML.
  • Horizontal y vertical Signaling.
  • Concrete sidewalk curbs.