Client: Ministry of Public Works and communications.
Period: 2009 – 2011.
Main jobs executed:
- Length of the section: 37 km.
- Embankment.
- Soil Base Added.
- Aggregate soil Sub Base.
- Asphalted Concrete.
- Soil cement.
- Reinforced concrete Bridges – Length: 60.00 ML.
- Horizontal y vertical Signaling.
- Concrete sidewalk curbs.