Client: Ministry of Public Works and communications.
Period: 2008-2010.
Main jobs executed:

  • Length of the section: 45 km.
  • Asphalted Concrete.
  • Asphalt irrigation.
  • Street patching.
  • Horizontal and vertical signaling.
  • Concrete sidewalk bord.