Construction of the route 2 (Km66) Aguaity – Tobatí, turnkey mode
Client: MINISTRY OF PUBLIC WORKS AND COMMUNICATIONS. Period: 2019 – 2020. Main works executed (in two sections) Section length: 24,20 Km. Final engineering design. Soil Movement. Works of Earth and drainage. Reinforced concrete bridges. Horizontal and vertical signage.
Construction of reinforced and metallic concrete bridges in various departments of the country
Client: Ministry of Public Works and communications. Period: 2017 – 2018. Main jobs executed: Construction of 12 bridges, at the departments of Concepción, Amambay, and San Pedro. Variable length – between 6 to 30 m. Installation and assembly of metal structures.. Complementary works.
Construction of the bridge over the river Ypane, section Tacuatí – Horqueta
Client: Ministry of Public Works and communications. Period: 2016 – 2017. Main works executed (in two sections): Length Bridge: 120m. Manufacture of reinforced concrete stirrups. Pillars and cross beams in prefabricated concrete. Installation and assembly of metal structures. Gabions. Complementary works.
Rehabilitation of country lanes – departamentos San Pedro, Caaguazu and Caazapa
Client: Ministry of public works and communications. Period: 2017 – 2018. Main works executed (in two sections): Section length: 39 Km. Stone pavement Construction. Road improvement with gravelling. Concrete sewer. Vertical signaling.
Rehabilitation and Paving of the Section: Caaguazú – Vaqueria (Section I and II)
Client: Ministry of Public Works and communications. Period: 2012 – 2014. Main works executed (in two sections): Section Length: 64 km. Embankment. Reinforced concrete bridges – Length: 220.00 Ml. Asphalt irrigation. Horizontal and vertical Signaling. Concrete sidewalk curbs.
Rehabilitation And Paving: Route 10 “Residentas”- Puerto Rosario – San Estanislao – Section II
Client: Ministry of Public Works and communications. Period: 2009 – 2011. Main jobs executed: Length of the section: 37 km. Embankment. Soil Base Added. Aggregate soil Sub Base. Asphalted Concrete. Soil cement. Reinforced concrete Bridges – Length: 60.00 ML. Horizontal y vertical Signaling. Concrete sidewalk curbs.
Recoating route N º 5 “Gral. Bernardino Caballero “, section: Yby Yau – Km. 179
Client: Ministry of Public Works and communications. Period: 2008-2010. Main jobs executed: Length of the section: 45 km. Asphalted Concrete. Asphalt irrigation. Street patching. Horizontal and vertical signaling. Concrete sidewalk bord.
Pedro Juan Caballero: Asphalt pavement in city streets
Client: Municipality of PEDRO JUAN CABALLERO. Periods: 2009-2010/2013-2014/2015/2016. Main jobs executed: Recoating: 700,000 m2 urban streets. Asphalted access of the City Bus Terminal. Vertical and horizontal Signaling. Concrete sidewalks curbs.
Asphalt paving of Intercity sections in the Dept. Central – Lote 2
Client: Ministry of Public Works and communications. Period: 2017 -2018. Main jobs executed: Section Length 50 Km. Regularization and asphalt paving. Sewer and Drainage Works. Signaling.
Stone pavement roads in several sections at Region Oriental Work 3: Section Horqueta – Rio Ypane
Client: Ministry of Public Works and communications. Period: 2013-2015. Main jobs executed: Section: length 39 km. Embankment – 450,000 M3. Bridges-In several sections (total length 80ml). Sewer and Drainage Works. Vertical Signaling.
Coastal treatment at the Right Margin – Package “B
Client: YACYRETA Binational Entity. Period: 2007 – 2013. Main jobs executed. Coastal Defense Filler (21.6 km). Slope Defense. Causeway. Stone base. Asphalt Paving. Storm drains and sewers. Urban works: sidewalks, bicycle-trails, Park Areas, railings. Civil works at the “Sambadrome”. Sanitary Landfill and grading plant.
Highway Rehabilitation and Maintenance Contract for Service Indexes (CREMA): National Route No. 3 – Limpio – Arroyos y Esteros – San Estanislao – Rotonda Arroyo Tapiracuaty – Rotonda Calle 6000 S (148.5km)
Client: MINISTRY OF PUBLIC WORKS AND COMMUNICATIONS (MOPC). Period: 2015 to 2022. Main works executed: Asphalt resurfaced – extension: 147 km. New asphalt plant installation: production 15,000 tn/month. Railing Installations. New signaling. Embankment expansion at flood areas. Section maintenance. Enabling roundabout access to Juan de Mena.